Irishtown Road Footbridge, Omagh (Design & Build Contract)

  • Start Date:
    February 2012
  • Completion Date:
    April 2012
  • Client:
    DRD Road Service
  • Project Value:
    £475,000.00

Description of works:

  • Design of spandrel arch steel footbridge
  • Site clearance and bulk excavation
  • Installation of water diversion and dam system
  • Design and installation of piling platform
  • Installation of pre-cast driven pile foundations
  • Construction of reinforced concrete bridge support thrust blocks and abutments
  • Installation of sheet pile flood defence wall incorporating concrete capping beam
  • Installation of drainage
  • Installation of service ducting
  • Embankment construction and landscaping
  • Fabrication and installation of 57 metre long steel structure with hi-spec protective paint system and bespoke stainless steel handrails
  • Waterproof bridge deck and lay anti-skid surfacing
  • Construction of approach foot/cycle paths to tie into existing
  • Erection of mesh grid fencing to neighbouring boundaries